濟(jì)南裝載機(jī)變速器原位檢修的步驟
[ 發(fā)布日期:2023-01-07 15:10:28 ] 來源:永保機(jī)械 瀏覽:371次
濟(jì)南裝載機(jī)http://www.hdwzhs.com/在施工過程中出現(xiàn)倒檔嚴(yán)重?zé)o力現(xiàn)象,判斷為倒擋活塞油封損壞。根據(jù)對(duì)濟(jì)南裝載機(jī)的操作經(jīng)驗(yàn),可以實(shí)行原位檢修,不僅節(jié)省時(shí)間,而且安全可靠,那么原位檢修有哪些步驟呢?下面永保機(jī)械的有關(guān)專家就給大家詳細(xì)介紹一下。
1、先放盡濟(jì)南裝載機(jī)變速器內(nèi)的液壓油,然后拆下變速器端蓋上的10個(gè)固定螺栓,取下端蓋;用2個(gè)M10的螺栓擰進(jìn)中間輸出齒輪的起吊螺孔內(nèi),將直接擋裝配體取出;擰下中蓋板上8個(gè)固定螺栓,取出I擋油缸總成與I擋活塞裝配體;取下15個(gè)彈簧和彈簧銷軸;取下I擋離合器主、從動(dòng)摩擦片,再取出I擋內(nèi)齒圈和余下的從動(dòng)片及主動(dòng)片;取出I擋行星輪架與倒擋內(nèi)齒圈裝配體。
First exhausted Jinan loader hydraulic oil within the transmission and remove the 10 bolts on the transmission cover, remove the cover; inside with two M10 bolts screwed into the intermediate output gear lifting screw, gear assembly
directly body removed; unscrew the cover eight bolts, remove the I block I block piston cylinder assembly and assembly; remove the 15 spring and spring pins; I removed the clutch master gear driven friction plate, then remove I block the rest of the ring gear driven and active tablets and tablets; I take out gear and reverse gear planetary carrier ring gear assembly.
2、取出摩擦片隔離架總成;取出倒擋離合器主、從動(dòng)摩擦片;用2個(gè)M10的起吊螺擰入倒擋行星輪架總成的起吊螺孔內(nèi)以取出倒擋行星輪架總成,然后取出余下的主、從動(dòng)摩擦片;取出倒擋活塞總成。
Remove the lining of the spacer frame assembly; remove the reverse clutch master, driven friction plates; with two M10 lifting screw screwed into reverse gear in the planetary carrier assembly lifting screw to remove the reverse gear planetary carrier assembly, then remove the remaining owners, driven friction plate; remove reverse gear piston assembly.
3、濟(jì)南裝載機(jī)http://www.hdwzhs.com/油封換完后,按拆卸相反的順序進(jìn)行裝配。
After changing the oil seal loader Jinan, according to the reverse order of disassembly assembly.